Fire stopping in Victoria
Large office floors, raised floors, suspended ceilings and a lot of cable.
- Every seal labelled and photographed
- BM TRADA / FIRAS-certificated contractors
- Written price before any work
Round Victoria Street and the station there are large office buildings, hotels and newer mixed blocks, plus Victorian mansion flats in the streets behind.
Office buildings here are typically concrete framed with a central core holding stairs, lifts, toilets and risers. The walls round that core are the main fire separation on each floor.

Office floors
Above the suspended ceiling: cable trays leaving the risers through the core wall. Fan coil pipework and condensate drains. Sprinkler pipes in some buildings. All of these cross the core wall in a row, and the seal round them has to be complete.
Under the raised floor: power and data running in the void from the core to the desks. Where the core wall carries on down to the slab under the raised floor, every cable crossing it needs sealing too. This one gets missed more than any other, because nobody lifts floor tiles when they inspect.
Floor to floor: risers with batt seals at each slab, sometimes with fire rated pillows where data changes often.
Hotels
Hotels near the station range from converted terraces to large purpose-built blocks. The issues in each are covered on our hotel fire stopping page.
Doing it on a live floor
Office floors are occupied in the day. Ceiling and raised floor work round desks is usually done in the evening or at weekends, a section at a time. If the floor is between tenants, that is the best time of all.
Sealing is carried out by our BM TRADA / FIRAS-certificated contractors.
Tell us the street, what the building is used for and send a photo. We will say what it needs and roughly what it costs.