Does fire stopping need listed building consent?
- Every seal labelled and photographed
- BM TRADA / FIRAS-certificated contractors
- Written price before any work
Sometimes. It depends on whether the work affects the character of the building, and that is for the council to decide, not us.
Listed building consent is needed for works to a listed building that affect its character as a building of special architectural or historic interest. That covers the inside as well as the outside, and it covers the whole building, not only the parts that look grand. Carrying out such works without consent is an offence. In Westminster the council's conservation and planning teams deal with it.
Most fire stopping is small in itself. Packing mastic round a pipe that already passes through a floor does not change what anyone sees. What can matter is getting to it.
Cutting an inspection hole in a lath and lime plaster ceiling with original cornice.
Lifting floorboards that are original.
Taking off panelling to reach a pipe duct behind it.
Fitting a visible collar or board on a decorative surface.
So the questions to put to the council are usually about access and finish, not about the seal itself.
There are ways to keep the work small. Use existing hatches and voids. Lift boards that have already been lifted before. Work from the less important side of a floor, the service void rather than the drawing room ceiling. Choose a seal that can sit inside the wall thickness and be finished flush.
We would rather you speak to the council before a survey than after it. If you have a heritage consultant or architect already, they will usually handle the conversation.

Tell us the street, what the building is used for and send a photo. We will say what it needs and roughly what it costs.